Saturday, July 29, 2006

New Caspar Trail

We got a lot of work done on the new trail. It was hot but a large part of the trail is now ridable. More work needs to be done to connect with the existing trail. Thanks to those able to help a switchback corner was completed as well as a lot of side hill bench cut. Another day of trail work will be set up soon. Hopefully it will not be as hot!
Chris Posted by Picasa